For Developers & Project Owners

One Structural Partner.
Get Months Back on Your Timeline.

Structural engineering, prefabrication, and installation under one contract. No scope gaps between separate subs, no change orders from coordination failures. 20-30% faster to certificate of occupancy.

0%Faster to certificate
of occupancy
0M+ sq ftMass timber
installed
$0K+Carrying costs
saved per project

The Cost Advantage

Material costs per square foot are comparable across three structural systems. It's the delivery process that defines your real cost.

Light foundation Compact crew Brief equipment window
Mass Timber $
Heaviest foundation Curing & formwork delays Large crew required Extended equipment rental Coordination gaps
Concrete $
Heavy foundation Extended crane rental Large crew overhead Fabrication queue Multi-contract coordination Schedule financing
Steel $

Schedule Advantage

Faster Erection, Earlier Revenue

Prefab manufacturing runs in parallel with site prep, not after it. Fewer trades on site, less coordination overhead, and a structural system that goes up in days per floor instead of weeks.

Mass Timber / Traditional Delivery
Site Prep
Fabrication + Erection
Mass Timber / QB Integrated
Simultaneous
Site Prep
Off-Site Manufacturing
30% Faster

One Point of Accountability

The Gap Between Your Structural Subs Is Where Margin Disappears

When structural engineering, fabrication, and installation operate under three separate contracts, nobody owns the seams. Coordination gaps become RFIs. RFIs become change orders. Change orders become schedule delays.

Traditional Model

?
Structural
Engineer
Material
Supplier
Fabricator
Installer

4 Contracts. 4 Agendas.

Each trade owns their scope and nothing else. The gaps between scopes belong to nobody. The developer absorbs the coordination risk, the RFIs, and the change orders that come with them.

QB Integrated Model

QBSingle Owner
Design
+ Engineer
Supply
+ Procure
Fabricate
+ Prefab
Install
+ Erect

1 Partner. Full Ownership.

Design, engineering, procurement, fabrication, and installation under one contract. The team that engineers the structure installs it. No handoff gaps, no scope disputes. One call, one answer.

Project Showcase

Proven Outcomes for Visionary Firms.

Timber Ridge Residences
Forge & Main
Lancaster Innovation Center

Timber Ridge Residences

Architect of Record: Smith + Associates

Multifamily  |  185,000 SF  |  Lancaster, PA
“QB’s early involvement allowed us to keep the vaulted timber ceilings exactly as envisioned without adding bulk to the structural members.”
Lead Architect
Next Step

Let's Look at Your
Specific Project

Share the building type, size, location, and timeline. We'll give you an honest assessment of whether mass timber makes financial sense and what integrated delivery looks like.